This was a newly renovated school in the southeast part of Houston. This scope consisted of a split mural design at the trophy case entrance with text in the center, and a wildcat logo on either side of the trophy case. There was also a Clear Creek logo and stripes painted in 3 locations within the school. One was in the boys athletics corridor wall, and the same identical mural was painted in 2 separate girls athletics corridor walls.
The corridor murals were painted in 2018. The troops case mural was completed in 2020.
May 2018 & October 2020 – Clear Creek High School – Clear Creek ISD – League City, Texas
Architecture & Design: PBK Architects General Contractor: Division One Construction
Project Scope: 6 Murals 620.34 Square Feet of Mural Painting