This was a newly-renovated school in the southeast part of Houston.  The scope included 3 murals, all on masonry.

The first 2 murals were text murals with the school eagle mascot in the center.  One was painted in the boys athletic corridor, and the other in the girls athletic corridor.  The eagle within the boys athletic corridor was partly painted over an expansion joint.  This is a prime example as to why airbrushing is a perfect method for painting porous, rough surfaces.  The airbrush allows the artist to paint inside every crevice to ensure continuous flow of the artwork.

The final mural was painted in the field house lobby and also included the school eagle mascot as well as text.

 

April 2020 – Clear Lake High School – Clear Creek ISD – Houston, Texas

Architecture & Design:  PBK Architects       General Contractor:   Durotech General Contractors

Project Scope:   3 Murals      881.5 Square Feet of Mural Painting

 