This was a newly-built addition to the existing high school. The scope consisted of 3 murals, two of which were in the gymnasium and one was a text mural in the cafeteria. One mural at the gymnasium exit was on drywall. The other 2 were painted on masonry.
The gym murals were painted in late 2021 and the last mural was contracted in mid 2022.
December 2021 & August 2022 – Clear View High School – Clear Creek ISD – Webster, Texas
Architecture & Design: PBK Architects General Contractor: Drymalla Construction
Project Scope: 3 Murals 277 Square Feet of Mural Painting