This project was completed in two separate gymnasiums within the school.  Two of the three were completed above bleachers, while the 3rd was completed above two exit doors.

Painting above bleachers can always pose a challenge.  We must assemble a split-level, multi-tier scaffold to sit on top of the extended bleachers and move the scaffold left to right as painting depicts.  This project, as is always the case, went very smoothly despite the scaffold-on-bleachers challenge.

 

September 2023 – Dickinson Junior High School – Dickinson ISD – Texas City, Texas

Architecture & Design:   PBK Architects      General Contractor:  Drymalla Construction

Project Scope:   3 Murals      792 Square Feet of Mural Painting