This was a newly constructed school north of Houston. This school sat side-by-side with Grand Oaks Elementary School which was constructed at the same time. We were contracted for both schools.
Grand Lakes project scope consisted of 3 murals. One mural was inside of the gymnasium, while the other 2 sat across from one another on each side of the stage in the multi-use room. All 3 murals included the school mascot, a tiger, along with text.
August 2021 – Grand Lakes Junior High School – Tomball ISD – Tomball, Texas
Architecture & Design: PBK Architects General Contractor: Gilbane Building Company
Project Scope: 3 Murals 208.38 Square Feet of Mural Painting